General Meeting NB Members Authorized Inspection Agencies Owner-User Inspection Organizations Review Team Leaders Test Lab
 

  Email      Print
   Technical Articles
A Boiler: The Explosive Potential of a Bomb
Acoustic Emission Examination of Metal Pressure Vessels
Anatomy of a Catastrophic Boiler Accident
Austenitic Stainless Steel
Auto-Refrigeration
Basic Weld Inspection - Part 1
Basic Weld Inspection - Part 2
Black Liquor Recovery Boilers - An Introduction
Boiler Efficiency and Steam Quality: The Challenge of Creating Quality Steam Using Existing Boiler Efficiencies
Boiler Logs Can Reduce Accidents
Boiler/Burner Combustion Air Supply Requirements and Maintenance
Carbon Monoxide Poisoning Preventable With Complete Inspection
Combustion Air Requirements:The Forgotten Element In Boiler Rooms
Creep and Creep Failures
Description of Construction and Inspection Procedure for Steam Locomotive and Fire Tube Boilers
Ensuring Safe Operation Of Vessels With Quick-Opening Closures
Environmental Heat Exchangers
Factors Affecting Inservice Cracking of Weld Zone in Corrosive Service
Failure Avoidance in Welded Fabrication
Finite Element Analysis of Pressure Vessels
Fuel Ash Corrosion
Fuel Firing Apparatus - Natural Gas
Grain Boundaries
Heat Treatment - What Is It?
How to Destroy a Boiler -- Part 1
How to Destroy a Boiler -- Part 2
How to Destroy a Boiler -- Part 3
Identifying Pressure Vessel Nozzle Problems
Inspection, Repair, and Alteration of Yankee Dryers
Inspection, What Better Place to Begin
Laminations Led to Incident
Lay-up of Heating Boilers
Liquid Penetrant Examination
Low Voltage Short Circuiting-GMAW
Low Water Cut-Off Technology
Low-Water Cutoff: A Maintenance Must
Magnetic Particle Examination
Maintaining Proper Boiler Inspections Through Proper Relationships
Microstructural Degradation
Miracle Fluid?
Organizing A Vessel, Tank, and Piping Inspection Program
Paper Machine Failure Investigation: Inspection Requirements Should Be Changed For Dryer Can
Pipe Support Performance as It Applies to Power Plant Safety and Reliability
Polymer Use for Boilers and Pressure Vessels
Pressure Vessel Fatigue
Pressure Vessels: Analyzing Change
Preventing Corrosion Under Insulation
Preventing Steam/Condensate System Accidents
Proper Boiler Care Makes Good Business Sense:Safety Precautions for Drycleaning Businesses
Putting a Stop to Steam Kettle Failure
Quick Actuating Closures
Quick-Actuating Door Failures
Real-Time Radioscopic Examination
Recommendations For A Safe Boiler Room
Recovering Boiler Systems After A Flood
Rendering Plants Require Safety
Repair or Alteration of Pressure Vessels
Residential Water Heater Safety
School Boiler Maintenance Programs: How Safe Are The Children?
Secondary Low-Water Fuel Cutoff Probe: Is It as Safe as You Think?
Short-Term High Temperature Failures
Specification of Rupture Disk Burst Pressure
Steam Traps Affect Boiler Plant Efficiency
Steps to Safety: Guide for Restarting Boilers after Summer Lay-Up
Stress Corrosion Cracking of Steel in Liquefied Ammonia Service - A Recapitulation
Suggested Daily Boiler Log Program
Suggested Maintenance Log Program
System Design, Specifications, Operation, and Inspection of Deaerators
Tack Welding
Temperature And Pressure Relief Valves Often Overlooked
Temperature Considerations for Pressure Relief Valve Application
The Authorized Inspector's Responsibility for Dimensional Inspection
The Effects of Erosion-Corrosion on Power Plant Piping
The Forgotten Boiler That Suddenly Isn't
The Trend of Boiler/Pressure Vessel Incidents: On the Decline?
The Use of Pressure Vessels for Human Occupancy in Clinical Hyberbaric Medicine
Thermally Induced Stress Cycling (Thermal Shock) in Firetube Boilers
Top Ten Boiler and Combustion Safety Issues to Avoid
Typical Improper Repairs of Safety Valves
Wasted Superheat Converted to Hot, Sanitary Water
Water Maintenance Essential to Prevent Boiler Scaling
Water Still Flashes to Steam at 212
Welding Consideration for Pressure Relief Valves
Welding Symbols: A Useful System or Undecipherable Hieroglyphics?
What Should You Do Before Starting Boilers After Summer Lay-Up?
Why? A Question for All Inspectors


Steps to Safety: Guide for Restarting Boilers after Summer Lay-Up


Robert Ferrell
Senior Staff Engineer
National Board

Category : Operations

Summary: This article was originally published in the Fall 2010 National Board BULLETIN.


Remember – the entire system must be carefully checked and operating procedures reviewed before the boiler is placed in operation. Boiler operators and other responsible personnel, such as supervisors, must be up to date on current codes and procedures.

It’s that time of year when heating boilers should be prepared for the heating season.

Before moving the boiler power switch to the ON position, survey the scene. I’ve taken that command from my first aid training. It means, “Before rushing in to help a victim, ensure you’re not the second victim.” Survey for potential hazards created by an improperly operating boiler or improperly stored material in the boiler room.

Your survey should ask the following questions: “What is the condition of the boiler system,” and “Has any work been performed on or near the boiler during the summer shutdown?”

If work has been done on or near the boiler, perform a system inspection tracing fuel lines, feed lines, steam and blow off piping, stack, and regulator vent lines. Check controls and control panels for evidence of damage and changes or loose connections. Inspect mechanical assemblies such as burner linkage and safety valve springs for paint, dirt, and rust accumulation which wouldn’t allow easy movement. Check all ventilation and combustion air openings are clean and free from debris.

Review the Manufacturer's Operation, Maintenance, and Instruction Manual for operation instructions. Become familiar with the timing sequence of the automatic controls. Then do a start-up check.

  • Verify water level in the boiler and test the low water fuel cutoff.
     
  • Verify the fuel train valve position.
     
  • Clean the flame scanner.
     
  • Verify peep sights on the burner and boiler are clean.
     
  • For steam boilers, verify operation of the feed/condensate system.
     
  • For water boilers, verify there is air in the expansion tank and make up water is available.
     
  • Verify electrical power is available to both the blower (power burners and induced draft) and control circuit.

Start the boiler by moving the power switch to ON. Reset all manual reset switches, low water fuel cutoff (LWFC), fuel pressure switches, and pressure or temperature limits switches. Observe the start-up sequence. It may be necessary to isolate the boiler from the system to warm it up slowly.

Verify the flame conditions in the combustion chamber.

On gas fired non- condensing boilers a cold start may produce condensate leaking from the gas pass covers and casing. Once the boiler water temperature exceeds 150° F the condensate should stop.

Once the unit has warmed, turn power switch to OFF. Verify the shut down cycle. Then restart. Let it come up to full firing rate and open isolation/ stop valves to put it into the system. Monitor it throughout the day, looking at the flame, stack outlet, controls, and linkage. Verify gasket tightness for both water side and fire side.

If any abnormal condition occurs during start-up, turn the power switch to OFF. Investigate cause before restarting the boiler.







About Us   |  Get Directions   |  Contact Us   |   Disclaimer   |   Logo & Marks Policy   |   Privacy Statement   |   Terms of Use   |   Site Map

Copyright 2017 The National Board of Boiler and Pressure Vessel Inspectors | 1055 Crupper Avenue Columbus, OH 43229 Ph.614.888.8320